{"id":221,"date":"2024-10-11T22:05:46","date_gmt":"2024-10-11T22:05:46","guid":{"rendered":"https:\/\/fep.ilc.edu\/?p=221"},"modified":"2024-10-14T14:17:44","modified_gmt":"2024-10-14T14:17:44","slug":"2024-clc-convention-action","status":"publish","type":"post","link":"https:\/\/fep.ilc.edu\/index.php\/2024\/10\/11\/2024-clc-convention-action\/","title":{"rendered":"2024 CLC Convention Action"},"content":{"rendered":"\n<p class=\"has-text-align-center has-nv-c-2-color has-text-color has-link-color has-large-font-size wp-elements-df4b90797e03398158b88a9a1ef7b8e6\" style=\"font-style:normal;font-weight:300\">&#8220;<strong>Moving Forward<\/strong>&#8220;<\/p>\n\n\n\n<p class=\"has-text-align-center has-nv-c-2-color has-text-color has-link-color has-medium-font-size wp-elements-2dbee8274fc07e186c598609fbf73618\" style=\"font-style:normal;font-weight:300\"><strong>&nbsp;<\/strong>(From the Proceedings of the 2024 Convention, page 47)<\/p>\n\n\n\n<p class=\"has-medium-font-size\">It was noted by the ILC Building Committee (ILCBC) Chairman Michael Roehl that the project was stuck in a &#8220;circular conundrum&#8221; in that the general contractor could not provide a realistic cost estimate without a viable timeline provided by the CLC which was difficult, if not impossible, to provide since the membership had trouble getting behind a project without a realistic cost estimate. <strong>Contractor<\/strong>: &#8220;Give us some dates so we can give you a cost. <strong>CLC<\/strong>: &#8220;Give us a cost so we can give you some dates.&#8221;<\/p>\n\n\n\n<p class=\"has-medium-font-size\">The membership of the CLC reiterated their resolve that the gym project should remain the top priority. Realizing the difficulty of obtaining funding for both projects (Fieldhouse\/Gym &amp; Fine Arts Center),&nbsp;<strong>the Convention voted to separate the two projects and move ahead with the gym project<\/strong>. With that new direction, the ILCBC instructed our architects to move forward with the approved design concept. Our general contractor, Market &amp; Johnson, completed the initial low-level bid process in September of 2023. Based on their data,&nbsp;<strong>the current estimate for the gymnasium project alone is approximately $10M.<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\">While certainly a daunting figure, it is encouraging to note that with $1.5M in the ILC Building Fund and $3M in the form of a CEF loan,&nbsp;<strong>we currently have funding in place for 45% of the estimated cost of the construction of the new gymnasium.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Moving Forward&#8220; &nbsp;(From the Proceedings of the 2024 Convention, page 47) It was noted by the ILC Building Committee (ILCBC) Chairman Michael Roehl that the project was stuck in a &#8220;circular conundrum&#8221; in that the general contractor could not provide a realistic cost estimate without a viable timeline provided by the CLC which was difficult,&hellip;&nbsp;<a href=\"https:\/\/fep.ilc.edu\/index.php\/2024\/10\/11\/2024-clc-convention-action\/\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">2024 CLC Convention Action<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":244,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[9,8],"tags":[],"class_list":["post-221","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-costs","category-timetable"],"jetpack_featured_media_url":"https:\/\/fep.ilc.edu\/wp-content\/uploads\/2024\/10\/2024Proceedings.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/posts\/221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/comments?post=221"}],"version-history":[{"count":6,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/posts\/221\/revisions"}],"predecessor-version":[{"id":258,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/posts\/221\/revisions\/258"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/media\/244"}],"wp:attachment":[{"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/media?parent=221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/categories?post=221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fep.ilc.edu\/index.php\/wp-json\/wp\/v2\/tags?post=221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}